Shields River Bank Restoration, Double T River Ranch, Clyde Park, MT.

Before and during construction
After Construction

Surveyed, designed, and provided construction oversight for the stabilization and re-vegetation of over 1,300 feet of channel bank-property boundary along seven separate eroding bank segments. Developed innovative, cost effective, and ecologically sensitive methods that utilized native materials; live cottonwood trees/root wads, juniper, willow, and alluvium material lifts created new inset floodplain for improved channel roughness, flood capacity, stability, and high quality aquatic/riparian habitat.